Desktop, Mobile landscape, Mobile portrait
About Control Room 4
Chernobyl Unit 4, 01:23. Balance control rods and coolant to hold the unstable reactor for two minutes — and think twice before pressing AZ-5.
0 plays · Released October 25, 2026 · v1.0.0
How to play
Drag the rod and coolant sliders; tap AZ-5 to scram.
Tags
Making of
Control Room 4 was made in PlayDrop Studio over 1 round.
